ProductsDetails

American standard alloy pipe P91
American Standard Alloy Pipe – ASTM A335 P91
Product Overview:
The P91 alloy pipe is a high-performance ferritic alloy steel pipe manufactured according to the ASTM A335 standard. It is specifically designed for high-temperature and high-pressure service, especially in power plants, refineries, and petrochemical plants. Known for its excellent creep strength, oxidation resistance, and thermal stability, P91 is widely used in superheater tubes, reheater lines, and boiler systems.
Key Features:
Standard: ASTM A335 / ASME SA335
Steel Grade: P91 (9Cr-1Mo-V-Nb alloy)
Pipe Type: Seamless
OD Range: 1/2" – 36" (21.3 mm – 914 mm)
Wall Thickness: SCH20 to SCH160, XXS, or as specified
Length: Single random, double random, or fixed length (up to 12m)
Chemical Composition (Typical):
C: 0.08–0.12%
Cr: 8.0–9.5%
Mo: 0.85–1.05%
V: 0.18–0.25%
Nb: 0.06–0.10%
N: 0.03–0.07%
Fe: Balance
Mechanical Properties:
Yield Strength (min): 415 MPa
Tensile Strength (min): 585 MPa
Elongation: ≥20%
Hardness: ≤250 HBW / ≤24 HRC
Service Temperature: Up to 650°C (1200°F)
Advantages:
Excellent high-temperature strength and creep resistance
Superior oxidation and corrosion resistance
Long service life in thermal cycling environments
Good weldability when properly heat treated
Ideal for critical high-pressure piping systems
Applications:
Superheated steam pipelines in thermal power plants
Headers, steam lines, and reheaters
High-pressure boilers and heat exchangers
Oil refinery furnaces and chemical reactors
Industrial processing plants with extreme service conditions
Delivery & Services:
Normalized and tempered (N+T) heat treatment
Full NDT (UT, RT), hydrostatic testing, and chemical analysis
Third-party inspection: SGS, BV, Lloyd’s, TUV
Beveled ends, threaded ends, or plain ends
Custom export packaging and marking

-
Weldability Differences of Flanges Made from Different Materials
2025-05-23 01:44:33
-
Anti-Corrosion Treatment for Welded Flanges in Buried Pipelines
2025-05-23 01:44:00
-
Special Requirements for Pre-Tightening Force Control in Welded Flanges
2025-05-23 01:43:23
-
Handling Bolt Hole Misalignment After Flange Welding
2025-05-23 01:42:01
-
Main Causes of Flange Deformation During Welding
2025-05-23 01:41:20

—— Contact:Manager
—— Tel:+86 15231788966
—— Email:info@zhantongpipe.com
—— Url:https://www.zhantongpipe.com
—— Address:Mengcun Hui Autonomous County, Cangzhou City, Hebei Province